Case Study

Aker Exhaust Gas Module and Bulkheads

Aker sought Rhoads capabilities for the fabrication and assembly of an exhaust gas module and accommodation blocks for three CV2600 dry cargo vessels.

Download

Case Study

Closed Loop Cooling Water System

The Power and Propulsion Test Facility in Building 633 sought Rhoads to complete the Closed Loop Cooling Water (CLCW) System.

Download

Case Study

Ticonderoga Class (CG-47) Equipment Harvesting

The US Navy’s Ticonderoga Class of Guided Missile Cruisers was aging and spare parts for major engineering components were sometimes in short supply.

Download

Case Study

Precision Custom Components

Precision Custom Components sought Rhoads’ Philadelphia Navy Yard facilities and its heavy and precision metal fabrication capabilities to complete and deliver a 500-ton styrene reactor built to ASME Section VIII specifications for The Dow Chemical Company.

Download

Case Study

Liscio’s Bakery

Liscio’s Bakery outgrew its current space to meet customer demands which housed a three roll oven and maintained plans to install a fourth.

Download

Testimonial

“I am impressed with the caliber of individuals Rhoads offers – extremely knowledgeable and very professional. Thanks for all of your help.”

Sweet Streets

Testimonial

“From the quality of work, commitment to safety and overall results of your team, I’ve always enjoyed working with Rhoads. You have always done right by me and I wanted to say thanks and let you know that Rhoads will be part of my plans for all my upcoming work.”

Kraft/Heinz-Dover

News

ASME Certification

Rhoads Industries has received Certification from The American Society for Mechanical Engineers (ASME) for Pressure Vessel construction.

Get a Quote from Rhoads Today!